Projects Building Design

© FCP
Vienna, Austria
For the design of the supporting structure of a building with such a complex geometry it was enormously important to use three-dimensional design already in the early project phases. Thanks to BIM technology it was possible to create a high-quality design and calculation model already in an early project phase.
Stahlkonstruktion im DG © FCP
Vienna, Austria
The total existing building was modelled based on the survey data in 3D and all new building parts are added to the 3D model. Apart from complete 3D modelling some field tests were performed by means of HoloLens in order to detect e.g. a collision between the wooden roof structure to be preserved and the new steel elements at an early stage.
© FCP
St. Pölten, Lower Austria
Im Zuge der Planung wurde in der Ausschreibungsphase das Revit-3D-Modell ausgearbeitet. Daraus wurden die Konstruktionspl√§ne f√ľr die Ausschreibung abgeleitet, die Massenermittlung f√ľr das Leistungsverzeichnis kontrolliert, 3D-Ansichten f√ľr diverse Abstimmungen mit Architektur und TGA erarbeitet und die Schalungspl√§ne generiert.