Projects Infrastructure

U2/U4 Pilgramgasse © FCP
Vienna, Austria
Das hochkomplexe Bauwerk wurde aufgrund der Herausforderungen in Bau und Betrieb des Objekts integrativ in BIM geplant.
© FCP
Doha, Qatar
FCP assumed the task of planning in this project and prepared the submodel for the field of slab track design. Before the preparation of the model the level of detail and the requirements for the submodel were agreed upon. The objective is to use the total project model for clash detection, visualization and adjustment.
© FCP
Austria
The total tunnel shell including the track system is modelled and the options and advantages of BIM are presented on the basis of this pilot project.