Project of the month . April 2018

Extension of Secondary School and New Construction of Elementary School Carlbergergasse

There are 12 classes of an open secondary modern school in Carlbergergasse 72 in 1230 Vienna, which was built in 1999. An annex to the existing school building will be realized for the creation of additional rooms. The annex comprises the new construction of 9 elementary school classes with all-day care including side rooms and an underground gym hall as well as the extension of the existing secondary modern school by 4 classes including side rooms. The open areas of the school are appropriately designed for pupils and instruction.

The annex is situated on the available hard court so that it can be connected to the existing building on two sides.

The project is in the basic design stage at the moment. Construction start is planned on 15 October 2018. Operation of the newly erected school building shall start in August 2019.

Client: Vienna municipal authorities MA 56 represented by WIP Wiener Infrastruktur Projekt GmbH

Services as subcontractor for Klammer * Zeleny Architekten ZT GmbH: Design-build, static and structural design, tender / cost estimation, building physics, site supervision, health & safety engineering, check engineering