Project of the month . May 2018

Postgasse 8

The former post office building was erected in the course of the last 2-3 centuries and was repeatedly reconstructed and extended. The building is situated between Postgasse and Dominikanerbastei, under which the former Viennese city wall was located.

Apart from the establishment of a hotel and flats in the existing structure the attic shall be converted. In this process the existing roof structure shall be maintained and an underground car park shall be built in Dominikanerhof. Furthermore respective installations are established in all courtyards. Due to the complex design the project is processed with BIM by FCP.

The demolition of non-load-bearing walls and superstructures is currently completed. The project is already approved and we are at the beginning of the detailed design phase.

more information . BIM und Postgasse