University Hospital St. Pölten – Inauguration of “Building C”

On Friday, 19 January 2018, the state-of-the-art annex to the university hospital St. Pölten was inaugurated.

During the design of the newly constructed Buildings C and G there was a focus on patient flows and the functional orientation of the interdisciplinary inpatient and outpatient wards as well as the surgery areas.

FCP was assigned with static design. In this connection the Revit-3D-model was elaborated in the tender phase. This was the basis for the structural plans for tendering, for checking the quantity survey for the service specifications, preparing 3D views for several adjustments with the architects and HVAC and generating formwork plans.

LINK . Universitätsklinikum St. Pölten