Motorway Zagreb–Macelj

Croatia
Client: 
Autocesta Zagreb–Macelj d.o.o. (AZM)
Services: 
Technical and financial control
Supervision of the construction progress
Project type: 
Competence Center: 
CC Project management infrastructure

The concession company AZM was granted the licence to construct and operate the motorway from Zagreb to Macelj with all the associated equipment and facilities (PPP-Model, 28 years).

Total length of the motorway from Zagreb to Macelj: approx. 60 km, two lanes and emergency lane each direction.

Northern part: approx. 19.4 km, newly constructed in difficult terrain with nine tunnel tubes (length between 300 m and 1,700 m), 15 new bridges (length between 150 m and 500 m, in total approx. 4 km), three intersections as well as new underpasses and flyovers, three toll stations, two rest areas (one filling station), and a new operation and maintenance centre with control room.

Southern part: approx. 6.4 km, extension from half to full cross-section. Construction of a new bridge over the Sava and rehabilitation of the existing bridge (main bridge in steel, access bridges in pre-stressed concrete, total length approx. 1 km).

Existing part: approx. 34 km, upgrading with SOS telephones, CCTV and three toll stations. Inspection and assessment study of existing structures and roadways.