Projekte

Oberbautechnik

Railway Section Bruck/Mur – Graz  | © FCP
Austria
According to the increase of the capacity and the operational availability of the Railway Section Bruck/Mur – Graz the technical condition of all assets needs to be enhanced.
VDE 8.1 | © FCP
Germany
As part of the traffic project German Unity VDE 8.1 the line starts from Ebensfeld and crosses the ThĂĽringer Wald by means of seven tunnels and six viaducts. The central station of Coburg is connected to the new track by an own junction also equipped with ballast-less track. In Coburg the line is connected to the next unit of project lot 2 center.
Map VDE 8.1 Los 2 Mitte (© FCP)
Germany
As part of the Traffic Project German Unity VDE 8.1 the line starts from Coburg, where the central station is connected to the new track by an own junction, and crosses the ThĂĽringer Wald by means of 12 tunnels and 14 viaducts In Ilmenau the line is connected to the next unit of project Los 1 Nord.
VDE 8.2 Erfurt – Leipzig/Halle (© DB AG)
Germany
This section, as part of the traffic project German Unity No. 8 from Munich to Berlin, is newly equipped with a ballast-less track.
Unterinntal Los A1 – Ballast-Less Track | © Toni Rappersberger
Tyrol, Austria
The track is designed as a slab track system in which the rails are bolted directly down on to a concrete support slab (System Ă–BB-PORR).
Wienerwaldtunnel | © FCP
Lower Austria/Vienna
The double-track new construction route Vienna–St. Pölten is linked to the connection route between Western, Southern and Donaulände railway line (Project “Lainzer Tunnel”) .