Pinzgau Narrow-Gauge Railway

Salzburg
Auftraggeber: 
Salzburg Government
Leistungen: 
Planung Oberbau
Projekttyp: 
Competence Center: 
CC Eisenbahnwesen

The Pinzgau narrow-gauge railway was to be reconstructed after flood damage. The admissible speed was to be increased and it was considered to establish a ballast-less track in areas with a special flood risk. For this reason an analysis of the track system and its different cross-sections and forms was required.

Projekt Infoblatt: