Skip to main content
Betriebsanlagengenehmigung

Operating Facility Approval

Obtaining an operating facility approval is complex – we make it straightforward.

With FCP, you gain an experienced team that brings together technical, legal, and environmental requirements in one well-considered package. Whether new planning or expansion – we support you with tailored solutions through to the successful approval of your facility.

Hanno Töll

An operating facility approval need not be an obstacle. We clear the way – competently, with foresight, and cost-effectively.

Hanno Töll
Authorised Representative FCP

Topics in Operating Facility Approval

Image
Betriebsanlagengenehmigung Icon Luft

Air

Emission analyses and dispersion simulations

Dust, odours, pollutants

  • Using sound emission analyses and dispersion simulations, we identify potential conflicts with neighbour protection at an early stage and develop targeted solutions.
Image
Betriebsanlagengenehmigung Icon Licht

Light

Analysis of daylight and artificial light, glare, and shading

  • Raytracing simulations for adequate workplace and exterior lighting at your facility.
  • Compliance with workplace-relevant standards and guidelines.
Image
Betriebsanlagengenehmigung Icon Lärm

Noise

Sound measurements, forecasts, and noise protection concepts

  • Protection of the surrounding environment.
  • Demonstration of approvability.
Image
Betriebsanlagengenehmigung Icon Schwingungstechnik

Vibration Engineering

Vibration assessments evaluating operational vibrations and the effects of operational influences

  • Assessment of vibrations from machinery, plant, and traffic.
  • Relevance for neighbour and employee protection.
Image
Betriebsanlagengenehmigung Icon Brandschutz

Fire Protection

Presentation of all necessary measures for fire prevention and fire-fighting

  • Fire protection concepts covering structural, technical, and organisational measures.
  • Tailored solutions for risk minimisation.
  • Documentation in compliance with regulatory requirements.
Image
Betriebsanlagengenehmigung Icon Abfall

Wastewater & Waste

Planning of drainage and waste management

  • Demonstration of legally compliant and environmentally sound disposal of operational waste.
  • Coordination with infrastructure and operational concept.
  • Discharge of rainwater and wastewater.
Image
Betriebsanlagengenehmigung Icon Verkehr

Traffic

Traffic engineering assessments

  • Analysis of traffic volumes, safety, and access.
  • Support with logistics concepts and regulatory coordination.

Step by Step to Operating Facility Approval

1. CONSULTATION

Initial analysis of requirements and project objectives, taking into account the relevant legal framework, including trade law and environmental protection law.

2. ANALYSIS

Assessment of the current situation, measurements, and environmental and hazard evaluations to determine the impacts of the planned facility.

3. EMISSION ASSESSMENT

Preparation of emission assessments and development of emission reduction measures – as the basis for the submission documents.

4. REGULATORY COORDINATION

Early communication with the responsible authorities to clarify open questions and avoid delays.

5. APPLICATION

Official submission of the application and conduct of the approval procedure, including any on-site inspections or hearings.

6. APPROVAL

Following review and any further adjustments, the approval notice is issued, containing all relevant conditions and requirements for the operation of the facility.

7. COMMISSIONING

After successful implementation, the facility is commissioned in accordance with all regulatory requirements. The authority may also require regular inspections after commissioning to ensure that all approval conditions continue to be met.

Are you planning a new facility or an expansion?

Your advantages with FCP

  • Interdisciplinary expertise across environmental engineering, construction, traffic, and law
  • Many years of experience across a wide range of industries
  • Efficient communication with authorities and stakeholders
  • Individual project support – targeted, solution-oriented, and cost-effective

 

Get in touch – we are happy to support you.

Hanno Töll
Authorised Representative FCP
toell@fcp.at
 

Flyer FCP Operating Facility Approval PDF

Fact Box

Service

Operating Facility Approval – interdisciplinary support for the planning and expansion of facilities through to regulatory approval

Target Group

Companies planning to establish a new facility or expand an existing one

Disciplines

Air, Light, Noise, Vibration Engineering, Fire Protection, Wastewater & Waste, Traffic

Process

1. Consultation · 2. Analysis · 3. Emission Assessment · 4. Regulatory Coordination · 5. Application · 6. Approval · 7. Commissioning

Responsible CC

CC Acoustics, Dynamics, Building Physics, Measurement & Instrumentation

Contact

Hanno Töll, Authorised Representative, FCP

Client Benefits

Interdisciplinary expertise across environmental engineering, construction, traffic, and law; efficient communication with authorities; individual and solution-oriented project support

Close
Close