Projekte

Winterfestspielhaus Erl © Toni Rappersberger

Event center:

Winter Festival Hall Erl

Competence Center:
CC Structural design buildings
Services:
Structural design

The winter festival hall in Erl is a prominent architectural structure and represents both the site and the remarkable supraregional reputation of the Passion Festival.
Campus WU Wien© Toni Rappersberger

Educational institution:

Campus WU Wien

Competence Center:
CC Project Management & Controlling Buildings
Services:
Technical & financial control

The university complex with a total of 160,000 m² gross floor is planned with six built up areas. The new University of Economics and Business aspires a qualitative and quantitative improvement of the service and the framework conditions for students and researchers.
Life Ball © Toni Rappersberger

Event center:

Life Ball – Wing Construction

Competence Center:
CC Structural design buildings
Services:
Health & safety engineering, Site supervision, Structural design

FCP supervised the total design services from the basic conception up to the construction at the building site for its construction design regarding the feasibility of the necessities of stage mechanics (displacement and rotation).
Main Station Vienna © Toni Rappersberger

Station:

Main Station Vienna

Competence Center:
CC Project Management & Controlling Buildings
Services:
Project management

The South station and East station will be changed into a novel through station. As a result of the adjustment of the line conditions a site of 56 ha is gained for development of real estate.
Drauquerung © Toni Rappersberger

Bridge Design:

Drauquerung – Koralm Railway Route Graz–Klagenfurt

Competence Center:
CC Bridge construction
Services:
Structural design

The Drau Crossing is a double-railed railway bridge in the course of the Koralm railway. The route traverses the Drau in the area of the Völkermarkter reservoir with a constant radius of 3,200 m and is appropriate for a design speed of Ve = 200 km/h.
Lainzer Tunnel – Final Construction © Toni Rappersberger

Track engineering:

Lainzer Tunnel – Final Construction

Competence Center:
CC Track engineering
Services:
Track design

Thanks to the "Lainzer Tunnel" the total freight traffic coming from the West can now pass through under the city. Because of different floating track slabs adjusted to the surroundings the best protection for the inhabitants is guaranteed.
A15 Maasvlakte–Vaanplein – Brücken © A15 A-Lanes

Bridge Design:

A15 Maasvlakte–Vaanplein, PPP Project

Competence Center:
CC Bridge construction
Services:
Structural design

Due to the expansion of the harbour in Rotterdam the approx. 37 km of the feeder motorway A15 have to be repaired, widened and partly newly built. The major structures are located in the areas Hartelkruis, Botlekcorridor and at Vaanplein junction.
Linie U5 - Lückenschluss © FCP

Metro:

Line U5 – Closing Gap

Competence Center:
CC Project Management & Controlling Buildings
Services:
Project management, Site supervision

Line 5 of Berlin Metro is to be completed by joining the Station Brandenburger Tor, currently under construction, with the existing tunnels at Alexanderplatz. The two track tunnels are being driven by TBM.
ÖAMTC Headquarters © Toni Rappersberger

Residential and office building:

Ă–AMTC Headquarters

Competence Center:
CC Structural design buildings
Services:
Structural design

ÖAMTC (Austrian Automobile, Motorcycle and Touring Club) intends to concentrate its current administrative sites in Vienna (Schubertring, Donaustadt, Schanz¬strasse, Dresdnerstrasse) in one building and establishes new headquarters with office area, support functions, membership service and a heliport in Baumgasse in the 3rd district of Vienna.
Wientalterrasse © Toni Rappersberger

Bridge Design:

Wientalterrasse

Competence Center:
CC Civil engineering
Services:
Structural design

The terrace for urban live above the underground line U4 and the Wienfluss is 76 m long and 14 m wide and offers 1,000 m² additional public space. The construction consists of prefabricated parts with topping reinforced concrete cover and a wooden surface.
VDE 8.2 © Toni Rappersberger

Track engineering:

VDE 8.2 Erfurt – Leipzig/Halle

Competence Center:
CC Track engineering
Services:
Track design

The 123-km-long new line from Erfurt to Leipzig/Halle is a standard-gauge, double-track electrified railway line for high-speed passenger and freight traffic. The line initially runs parallel to the existing line starting from Erfurt central station but then branches off and crosses the Thuringian Basin.
U1/10 Trostgasse © Toni Rappersberger

Metro:

U1/10 TroststraĂźe

Competence Center:
CC Ingenieurtiefbau
Services:
BauKG, Statisch-konstruktive Planung/PrĂĽfung

The section U1/10 is part of the extension of the existing underground line U1 to Oberlaa and consist of the conversion of the current end station and train turning bay and new construction of tunnels and shafts.
Secession – Beethovenfries © FCP

Noise & vibration:

Secession – Beethoven Frieze

Competence Center:
CC Acoustics, dynamics, measurement & instrumentation
Services:
Acoustics and Measurement & Instrumentation

By order of the Austrian Gallery Belvedere vibration studies were carried out at the Beethoven frieze, one of the most famous works of art by Gustav Klimt.
© FCP

Industrial design:

Montes del Plata, Pulp Mill in Punta Pereira

Competence Center:
CC Building design
Services:
Structural design

Montes del Plata, as a consortium, has made the decision to build a cellulose pulp mill in Punta Pereira in the Department of Colonia in Uruguay.