Renovation Volkstheater

Tue, 01.09.2020

Volkstheater has been considerably renovated since summer 2019. Essential objectives are an improvement of the operation and an increased comfort for the audience.

The improvement of the operation can be reached by two measures: on the one hand, by rehabilitation and modernization of the stage area with new stage and lighting technology as well as by the establishment of a side stage and on the other hand by creation of new useable space by extension of the present stage area as well as the extension of the existing ticket area to a coffee shop.

Increased comfort for the audience is implemented on the one hand by a complete refurbishment of the auditorium including the installation of a new air-conditioning system and on the other hand by the renewal of the lounges, cloakrooms and sanitary rooms. The façade is rehabilitated as exterior sign of renewal.

In summer 2019 the restoration of the outer shell (façade, roof and windows) started without interrupting continuous operation. At the beginning of January 2020, the theatre was closed for the currently ongoing main construction phase. The completion is already planned for 30 October 2020.

Client. Volkstheater GmbH

Services. project control, static and structural design, tender/cost estimation, building physics, fire protection design, check engineering

Involved CCs. CC Project Management & General Consultant Buildings, CC Structural Design Buildings, CC Building Design, CC Tender Procedure & Cost Determination

 

 