Skip to main content
Press
// 15.12.25

Winner of the Award Procedure New Danube Bridge Mauthausen

The design of the new Danube Bridge Mauthausen as well as the foreshore structure Lower Austria was assigned to the civil engineering offices FCP and Schimetta.

The new Danube Bridge is a prestressed concrete bridge which is built in the cantilever method with several river piers.

 

> Article in German on orf.at

Close
Close